Removal |
1. |
Remove the battery.
G 1.6 GDI (Refer to Engine Electrical System - "Battery")
G 2.0 GDI (Refer to Engine Electrical System - "Battery")
G 2.0 MPI (Refer to Engine Electrical System - "Battery")
D 1.7 LP (Refer to Engine Electrical System - "Battery")
D 1.7 HP (Refer to Engine Electrical System - "Battery")
|
2. |
Remove the ECM.
G 1.6 GDI (Refer to Engine Control/Fuel System - "Engine Control Module")
G 2.0 GDI (Refer to Engine Control/Fuel System - "Engine Control Module")
G 2.0 MPI (Refer to Engine Control/Fuel System - "Engine Control Module")
D 1.7 LP (Refer to Engine Control/Fuel System - "Engine Control Module")
D 1.7 HP (Refer to Engine Control/Fuel System - "Engine Control Module")
|
3. |
Remove the following items.
[Diesel 1.7 LP / HP]
[Gasoline 1.6 / 2.0]
|
4. |
Disconnect the clutch sensor connector. (Only Electronic Parking Brake)
|
5. |
Remove the smart junction box.
(Refer to Body Electrical System - "Relay Box (Passenger Compartment)")
|
6. |
Remove the clutch pedal.
|
7. |
Remove the master cylinder from the clutch pedal.
|
Installation |
When installing, O-rings of clutch tube & regulator connector should
be replaced with a new one.
|
1. |
Install in the reverse order of removal.
|
2. |
After be equipped, perform bleeding air procedure after pouring the
brake fluid.
[Gasoline 1.6 / 2.0, Diesel 1.7 LP]
(Refer to Clutch System - "Clutch Release Cylinder")
[Diesel 1.7 HP]
(Refer to Clutch System - "Concentric Slave Cylinder Assembly")
|